How to read your score
Give an answer 0 points when the condition is absent or unverified, 1 when some of it is in place, and 2 when the team can show it is in place. Each question has the same maximum. Four questions put each group at up to eight points, and the five groups add to 40. Equal weights make it easy to trace a score back to the answers. For example, a group with answers of 2, 1, 0, and 2 contributes 5 points.
Use the bands after all 20 answers to decide which work to do first. They do not predict whether a pilot will succeed. Check for answers that could stop a pilot at any score.
| Points | Next step |
|---|---|
| 0–14 | Write down the job. Follow a real case from intake to completion with the person who does the work. |
| 15–24 | Fix the gaps that block a test. Assign an owner and get a sample of records the reviewer can use. |
| 25–32 | Run a supervised trial on past cases. Check how the output compares with the team's decisions. |
| 33–40 | Consider a small pilot alongside the current process. Agree on what the team will measure and when to stop. |
What to check in each group
Start with a single job and name its start and finish. For a shared inbox, the job might start when a customer email arrives and finish when it reaches the right team. Use that boundary for every answer. The person who handles the inbox can walk you through a forwarded email and show where it gets stuck. If you have not picked one yet, the eight automation examples ranked by likely payback are a place to start.
For process, check whether the job repeats and whether a reviewer can tell a correct result from a wrong one. A ticketing system might show how many requests were assigned last week. Ask a reviewer to point to a correct assignment and explain what they do when the category is unclear.
For data, check whether you can connect the records a reviewer needs. If the email body is available but the resolution is in a separate system, find out whether you can match the two before you build a test around them.
For people, name who will review disputed assignments and who can pause the pilot. Write those names down.
For systems and access, check that an approved export or test account can reach the fields the workflow needs. Ask whoever grants access to confirm what the test account can read or change.
For risk, check where a wrong assignment could cause harm and whether the team can trace it back to the original email. Find out who can switch the work back to the manual queue.
If two colleagues score the same question differently, ask each to show the case they had in mind. One might be picturing a standard request and the other a complaint that contains sensitive information. Bring both cases into the pilot plan and decide what each one should do at the handoff.
Vecto Crew developed the assessment questions, weights, and score bands independently. For broader risk management, see NIST’s AI Risk Management Framework 1.0 in the sources. It offers voluntary guidance for organizations that design, deploy, or use AI systems.
Check the answers that could stop a pilot
Even a score of 38 can include a zero on who approves data access. Pause the pilot at any total if you score zero on any of these checks.
- Correct results. Reviewers have no shared way to tell whether a result is correct.
- Records and permissions. Reviewers lack confirmed access to representative records, nobody knows who approves access, or the pilot would need someone’s personal login.
- Ownership and review. Ownership changes from case to case, reviews depend on whoever is free, or the team has no way to take back cases the pilot sets aside.
- Safe testing and recovery. Testing requires live writes, the team has yet to check for sensitive data or the consequences of wrong output, results cannot be traced back to their inputs, or the team has no agreed way to stop the pilot and resume manual work.
Use the trial itself to see whether the model can handle your cases and save time. Time how long a reviewer takes to check a draft assignment and compare it with doing the job by hand. In the worked example of our AI agent cost breakdown, reviewer time is most of the monthly bill.
Take one gap into the next team meeting
Pick a low-scoring answer and ask the person closest to the work to bring evidence. For review time, ask the team lead to name the reviewer and put time on the calendar. If correcting that gap makes a trial possible, write down what counts as a correct result and measure the current work first. Use the same measure during the trial, including the time spent reviewing and correcting its output.
For help scoping that work, our first service is an audit and roadmap. We map the workflow and review its data and access before ranking the work by value and effort. Read what studies of failed AI projects measured if you are building the case for a pilot.
Practical questions about the assessment
How long should I set aside?
Set aside about ten minutes for a first pass if you know the workflow. If an answer depends on a record or permission you need to check, choose 0 for now and revisit it with the person who can verify it.
Are my answers stored?
The assessment does not store or send your answers. It calculates the score in your browser as you choose each answer. There is no email field or submit button.
What should I do with a low score?
Ask the person who does the work to show you a routine case and a recent exception. Use both to write down the steps and who handles the handoff. Re-score the same workflow after you have checked the answers that changed.
Sources
- NIST AI Risk Management Framework 1.0, published .