Measure AI ROI by running the same job before and after the change and pricing the difference over a stated period. Time the person who checks the AI output and include the work of fixing errors that reach the next desk. Cash ROI compares cash savings with project costs. Capacity ROI adds the value of staff time available for other work.

Copy these lines into a spreadsheet

Before-and-after worksheet for one workflow over comparable periods
LineHow to measureBeforeAfterNote
Eligible jobsCount jobs reaching the agreed finish line.___ jobs___ jobsInclude manual fallbacks. Record arrivals and unfinished jobs alongside completions so a growing backlog stays visible.
Handling timeTime active work to prepare each job for review. Record the mean per job.___ min/job___ min/jobInclude manual fallbacks. Track queue time separately if turnaround matters.
Review timeRecord the total active minutes to inspect and clear jobs, then divide by all eligible jobs.___ min/job___ min/jobCount zero for jobs that needed no review. Include information lookup and corrections before release.
Error rateDivide jobs with an error that passed review by jobs checked.___ / ______ / ___Use the same definition of error and the same sampling rule in both periods.
ReworkSum staff minutes spent repairing jobs after the finish line.___ min___ minFollow both groups of jobs for the same amount of time.
Workflow upkeepLog hours spent maintaining rules, checking run logs or recovering failed runs outside case handling.___ hours___ hoursInclude the person who is on call for the workflow.
Staff costUse wages plus employer payroll costs and benefits for the staff doing the work.$___/hour$___/hourIf handling and review use different roles, value their time separately.
SubscriptionsTake seats, plans and fixed hosting charges from billing records.$___/period$___/periodUse the share of a new subscription attributable to this workflow.
Metered usageRead invoices for model calls, document processing or charges per run.$___/period$___/periodList usage charged outside a subscription here.
Build and rolloutRecord one-time integration, testing and training costs. Divide by the months in your evaluation window for a monthly view.$___/month$___/monthRecord the full amount separately for cash payback.
Other cash spendingPull the bills affected by the change, such as rush shipping.$___/period$___/periodUse a quantity and a unit cost so you can explain the change.
Paid hours removedCheck payroll or contractor invoices for hours you stopped paying for.$___/period$___/periodKeep these dollars out of the separate valuation of hours freed for other work.
  1. Handling and review minutes. For each job group in each period, use reference job count × (average handling minutes + average review minutes). Use the same reference job count for each group in both periods.
  2. Rework minutes. For each group and period, use reference job count × return rate × average minutes per return. Use the period’s return rate as a fraction of jobs and its average fix time for each return.
  3. Hours freed. In each period, sum handling, review and rework minutes across groups, divide by 60 and add the full period’s upkeep hours. Subtract the after total from the before total.
  4. Value of staff time. Subtract any freed hours you stopped paying for. Count those payroll or contractor savings under cash savings. Multiply the hours available for other work by the staff rate. If rates differ by role, calculate each role’s change in hours at its own rate and add the dollar amounts.
  5. Cash ROI. Monthly project costs equal new monthly operating costs plus the monthly share of the build. Use (monthly cash savings − monthly project costs) ÷ monthly project costs × 100.
  6. Capacity ROI. Use (monthly cash savings + monthly value of staff time − monthly project costs) ÷ monthly project costs × 100.
  7. Cash payback. Record the build payment when it goes out, then add net cash savings as they arrive. Payback is the point when cumulative net cash savings cover the build.

Build the hourly staff rate by adding wages, employer payroll taxes and benefits for the people doing the work. Divide by the hours they worked in the same period. The AI agent cost breakdown gives examples of what to collect from engineering and vendor bills. To compare the same demand against adding paid capacity, see AI automation versus hiring.

Illustrative example of an embroidery shop freeing 16 hours a month

These are illustrative numbers for a uniform embroidery shop that matches artwork on production proofs against approved customer specs. It handles 420 jobs in each measurement month. Before, staff find the approved artwork and compare the details by hand. After, AI pulls out the details to check, with links to the spec and the proof. A production coordinator reviews both before releasing the job to the embroidery floor. Count a job as an error if the floor sends its proof back because a spec mismatch escaped review. Staff check all 420 jobs in each period for returns over the same follow-up window.

In the first month, preparation averages 7.5 minutes a job and release review averages 0.5 minutes. After the change, preparation takes 3 minutes and the coordinator has 2.5 minutes of release review per job. The floor sends back 21 proofs before and 14 after, so the return rates are 21 ÷ 420 × 100 = 5% and 14 ÷ 420 × 100 ≈ 3.3%, respectively. Assume each return takes 10 minutes to fix in the first month and 12 in the second. Price those corrections separately from the release review.

  • Before, 420 × (7.5 + 0.5) + 21 × 10 = 3,570 minutes, or 59.5 hours.
  • After, 420 × (3 + 2.5) + 14 × 12 = 2,478 minutes, or 41.3 hours. Add 2.2 hours of workflow upkeep for 43.5 hours.
  • The existing schedule has 59.5 − 43.5 = 16 hours left for other work. The assumed $46 hourly staff cost includes wages, employer payroll taxes and benefits. At that rate, the time is worth 16 × $46 = $736 a month.

The shop keeps the same payroll. Its cash saving comes from fewer courier upgrades to make up for late proofs. At an assumed $28 per upgrade, nine upgrades in the first month cost 9 × $28 = $252. Three in the second cost 3 × $28 = $84. Subtract the bills to get $252 − $84 = $168 in cash savings.

Assume the shop pays $3,600 for the build. Spread it over the twelve months the owner is budgeting, or $3,600 ÷ 12 = $300 per month. The assumed platform bills are $94 + $28 = $122 a month for subscriptions and metered usage. Together those costs come to $300 + $122 = $422 a month over the evaluation window.

Capacity ROI is ($168 + $736 − $422) ÷ $422 × 100 ≈ 114.2%. Cash ROI over the same window is ($168 − $422) ÷ $422 × 100 ≈ −60.2%.

To check payback, put the $3,600 build on the day the shop pays it. On the assumed monthly bills, the project returns $168 − $122 = $46 in cash after launch. At that rate the payback is $3,600 ÷ $46 ≈ 78.3 months. The owner has to decide whether the shop can put those 16 hours a month to enough use to justify a build whose cash payback runs well past the twelve-month budget window.

An old brass balance holds glass weights on one side and blank paper cards on the other.

Use the same job mix on both sides

If the first project is still up for debate, choose a task with a checkable finish line before taking timings.

Start and stop the clock at the same points. For the embroidery shop, preparation begins when the approved artwork and spec are available. Release occurs when the coordinator sends the approved job to production. Start the follow-up window at release and check both sets of records for escaped errors after the same interval. If you stop reading the pilot records on the day it closes, the last jobs have had less time to come back.

Match periods by the work they contain. The U.S. Census Bureau explains that recurring seasonal movements can obscure the trend in raw data. A shop could have a month of repeat school orders before launch and a month of new team artwork afterward. Break those jobs into separate groups, calculate each group’s average handling and review time, and apply each change to the same set of reference counts. Keep the upkeep total for a full period. Report the raw volumes next to the adjusted comparison so another person can reproduce it.

Write down other changes on the shop calendar. If a new intake form went live the same week as AI, a before-and-after comparison estimates the combined change. A closer test keeps the form fixed and sends comparable incoming jobs through the manual and AI-assisted routes during the same weeks. The NIST/SEMATECH engineering statistics handbook describes keeping other influential factors constant within groups while varying the factor under test. In the shop, group by new versus repeat artwork and assign comparable jobs within each group to the two routes.

Agree on a quality limit before deciding which number wins. A faster proof that sends a bad match onto a machine uses operator time and can waste a garment. If defects rise past the limit your floor lead agreed to, isolate the problem before treating the freed hours as a gain. Recheck the worksheet once staff are running both the review and exception work as they would in production.

Sources

  1. U.S. Census Bureau, Seasonal Adjustment Questions and Answers, question 3. Revised October 8, 2021. Read November 26, 2026.
  2. NIST/SEMATECH e-Handbook of Statistical Methods, section 5.3.3.2. Read November 26, 2026.
  3. U.S. Bureau of Labor Statistics, Employer Costs for Employee Compensation concepts. Read November 26, 2026.