Score a forward deployed engineer on seven criteria. Give the most weight to workflow discovery with staff. A candidate who spots that the second shift follows a different rule can test both shifts before promising either one a release. The other rows cover scope and sequence, integration and data handling, quality and evaluation, access and write permissions, production response, and handover. Vecto Crew works alongside client teams in this role.

Give workflow discovery with staff 30 of the 100 points

These are suggested weights for a hire who will take a workflow from discovery to live use. A candidate can design a sound integration and still ask for too much access, so score those decisions separately. Use the same rows and weights for everyone interviewing for the assignment.

Forward deployed engineer interview scorecard, 100 points available
SkillWeightInterview promptStrong signalWeak signal
Workflow discovery with staff30Walk through the last disputed equipment release with the shift lead. Which parts of the brief would you check first?Asks the lead for a particular case and traces who saw which record before making the decision.Asks only the sponsor or starts laying out a dashboard before the shift lead has finished.
Scope and sequence15Pick the first change the shop can try next week. State the step it will take over and which decision stays with the lead.Chooses one line or equipment group and gives the lead a visible result to accept or reject.Bundles the lookup, approval and full-shop rollout into the first release.
Integration and data handling20Sketch how you would link a machine to its latest calibration record. Show what happens when an import arrives late.Uses a stable machine identifier. Distinguishes the time of the check from the time it took to import the record.Joins on the display name or treats the latest uploaded file as the latest check.
Quality and evaluation15Choose the cases you would replay before staff can rely on the lookup and describe one failure that would stop release.Includes an expired check, a correction and an ambiguous record. Treats showing stale evidence as current as a release blocker.Validates only on machines with a single clean record.
Access and write permissions8Name the permissions the first version needs.Starts with approved read access to the relevant records. Leaves equipment release with the shift lead.Requests broad write access to logs or release status before explaining what it is needed for.
Production response7A shift lead reports a machine missing from the lookup during handoff. Talk through the first few minutes.Checks when the source last refreshed and gives the lead a manual lookup while the issue is investigated.Suggests a restart before finding out whether the record is missing at the source or in the lookup.
Handover5Give the backup lead a short note for tomorrow’s shift, then ask them to use it.The backup can find the source record and explain who resolves a discrepancy.The notes cover setup but leave the backup dependent on the candidate to interpret an exception.
Steel calipers grip a block of frosted glass lit mint on a dark work surface.

Give the candidate a shift handoff to untangle

Use this illustrative example for a 45-minute interview. A machine shop checks calibration records before a shift lead releases equipment for use. The maintenance system has machine IDs. On the floor, staff refer to the machines by nicknames. The latest check usually appears in an export, but a technician’s correction can arrive after the export is generated. The owner’s brief says the lead needs to find the latest check faster.

Give each candidate a fictional equipment list and maintenance export at the start. An entry for machine M-17 might have the floor nickname “Blue Lathe.” Keep a maintenance note in reserve that says the check attached to M-17 actually belongs to M-71. Decide ahead of time who made the correction and where the shift lead would verify it. Let the person playing the lead give the same facts in each session.

Save the correction for the middle of the interview

Allow 10 minutes for questions. Have an operations interviewer play the shift lead and describe yesterday’s handoff when asked. Let the candidate choose what to inspect. If they ask who can release equipment, say that the shift lead makes the decision and the maintenance technician can correct the source. That answer gives them an approval boundary they can carry into their design.

Allow 20 minutes to sketch the lookup, then give the candidate the correction. Ask them to trace both machine IDs through their proposed flow and revise anything affected. A good revision exposes the original entry and the newer correction so the lead can check the source. Look for evidence that the candidate can change their design when the person doing the work supplies a fact they missed. Hire for that response as well as for the first sketch.

Use the last 15 minutes for quality and evaluation, production response, and the handover note. Ask the candidate to put the follow-up in terms the next shift could use. For instance, the backup needs a place to see when the lookup last refreshed and a person to call if the displayed record disagrees with maintenance. Have the operations interviewer follow the candidate’s handover note using only the packet and report where they get stuck.

Write down what each interviewer heard

Score each row independently before discussing the candidate. Give a 0 if the response matches the weak signal, 1 for partial evidence and 2 if it meets the strong signal. Multiply the weight by the rating and divide by two. A 1 on integration and data handling earns 10 of its 20 points. If a prompt ran out of time, record it as unscored and return to it before comparing totals.

Download the scoring worksheet (CSV) to fill in or print. Use one copy per interviewer. Put a specific observation in the evidence column, such as “checked who could correct M-17.” If the candidate scores zero on workflow discovery with staff or on access and write permissions, ask for a second sample focused on that gap before advancing them. A high total can conceal that the proposed workflow would let an integration change the release status on its own.

Have a technical interviewer score integration and data handling as well as production response. If you're considering a hire, use a separate, small coding exercise with synthetic records to verify the candidate can implement the join and write a test for the correction. The operations interviewer can judge whether the workflow makes sense for the shift lead. The coding sample gives the technical interviewer something concrete to review. Use the hiring-route comparison if you need someone who can also review the work after launch.

A familiar stack is a tiebreaker

Experience in your stack can shorten onboarding. Give it more weight when a hard dependency is already decided, such as a maintenance system the shop must keep. For this exercise, the person who can explain which version of the calibration record the shift lead sees has answered the more immediate design question. If the assignment ends with a product trial or a design recommendation, use the comparison with solutions engineers and architects to set a different interview brief.

Palantir’s Chicago opening asks for a strong coder who can work in teams of technical and nontechnical people and iterate with users. OpenAI’s San Francisco infrastructure opening asks for production code and reproducible experiments and evaluations on real workloads. In The Pragmatic Engineer’s 2025 reporting, Gergely Orosz describes how Colin Jarvis’s team at OpenAI built quality checks with input from users before delivery. The forward deployed engineer explainer shows where those checks fit in a deployment. Set the depth of the coding exercise by what the person will have to maintain on your team.

Sources

  1. Palantir, Chicago forward deployed software engineer posting (undated, read November 26, 2026).
  2. OpenAI, San Francisco forward deployed engineer posting for AI infrastructure (undated, read November 26, 2026).
  3. Gergely Orosz, The Pragmatic Engineer, reporting on forward deployed engineers (August 12, 2025, with an undated update).