A sealed envelope, a ribboned box and an open roll of steel tools sit on dark slate.

Vecto Crew works in the forward deployed model, and we think live order automation needs someone who can fix the code after the first bad order. A consultant helps you decide what should change, and a project agency builds to an agreed specification and handles post-launch work if the contract covers it. A forward deployed engineer writes code alongside your staff and takes it live, as OpenAI describes in its Deployment Company announcement.

The same order inbox, three engagements

In this made-up example, a distributor wants to turn order emails into draft orders in its inventory and order system. A clerk opens each attachment, finds the customer account and looks up the item codes. A regular buyer sometimes forwards yesterday’s order with a note asking for a larger quantity. The clerk knows to open the existing order and check with sales before changing it. The owner’s initial brief just says “enter orders from email.”

Suppose the owner gives three providers the same six-week window. The consultant is hired to recommend a process. The agency gets a defined integration to build. The forward deployed engineers are hired to test a narrow workflow at the order desk and launch it if the desk can use it. The six-week window is an assumption for this example. A real rollout would depend on access to the order system and what the pilot found.

Illustrative engagements for the distributor’s order inbox
CheckpointConsultantAgencyForward deployed engineer
First two weeksInterviews the desk and identifies where manual entry stalls.Agrees which fields to import and which attachments the integration will accept.Sits with the desk, traces a revised order, and tests draft creation against sample messages.
After six weeksA recommendation and a specification another team can build from.An integration for the agreed attachments. The desk checks any message the system sets aside.A live rollout for a small set of customers. The desk checks drafts, and engineers respond to failures within the engagement.
Who maintains itThe team you hire to build it or an internal team.The agency if support is in scope. Otherwise, the team that accepted delivery.The forward deployed engineers through the agreed rollout, then the named maintainer after handover.
What you paid forA decision you can act on and the reasoning behind it.A defined integration that passes its acceptance tests.Engineering time alongside the desk, including changes based on what happens under real use.

Suppose a forwarded revision arrives in the first week after the engagement ends. Under the consultant’s scope, the clerk still handles the revision by hand using the documented rule. If the owner later hires a team to automate it and a second draft appears, the clerk flags the duplicate. The owner needs to arrange who builds the rule and who has permission to fix it and replay the message with the desk.

If the agency’s integration is live, the clerk flags the second draft during review. The agency checks the case against the acceptance tests and can fix it if the contract covers the repair. Otherwise the owner needs a separate support agreement or a maintainer with permission to change the integration and replay the message.

During rollout, a forward deployed engineer can watch the clerk resolve the duplicate, change the matching rule and replay the message with the desk. After handover, the clerk flags the duplicate and the maintainer named in the handover can check the run log, fix the rule and replay the message with the desk. Before the engagement ends, give that person access to the code and the permissions they need to test and deploy a fix. Any provider can agree to handle those steps. Put the person and their responsibilities in the proposal.

Keep the people who write the code close to the order desk

At Vecto Crew, we start by watching the people who run the workflow. A brief written a few steps away from the desk can make an order amendment look like an unusual email format. The clerk sees a different problem. The first order may already be on the warehouse floor. If it is, the right move is to call the warehouse before anyone promises the new quantity. That detail changes where the automation stops and which person gets the message.

We work in the client’s chats, tools and stand-ups. In the distributor example, the desk might post a confusing message in the same channel it uses to ask whether an order has been picked. A forward deployed engineer following that thread can see who settles the question and which record they check. A fixed specification earns its keep when changes are rare. Some contracts require a signed request from a client representative to change the scope, as Progress’s professional services agreement illustrates. If the engineers see only the request, they may have to ask the clerk which record to check. Agree on how the desk can talk to the engineers before the work starts.

A demo shows that an email can become a draft. The production decision is whether the desk can rely on the workflow while shipping orders. We agree on the numbers we’ll use to judge success. Users try the pilot on their real data. When we put it into production, we add monitoring and access controls. In the example, counting drafts generated would credit the duplicate. We would look at how many drafts the desk could accept and how much time it still spent correcting them. A falling volume of manual entries means little if the desk now spends the morning sorting out exceptions.

Our delivery process includes training and documentation for the people taking over. A new supervisor opening yesterday’s failure report needs to know which drafts are safe to retry and whom to call about the others. If only the forward deployed engineers know the answer, the desk still depends on them after delivery.

Buy advice when the decision spans departments

A consultant is the better hire when leadership needs to choose between changes in sales, finance and operations before any team gets a build budget. A recommendation can show that a gain for sales would land extra work on operations. It should say which project gets the budget first. Say sales wants automatic quoting while operations is trying to retire the item catalog those quotes depend on. Resolving which catalog will govern prices is a leadership decision. A consultant can organize the evidence and get the teams to make that decision together.

If your own compliance team requires an independent sign-off for a regulated decision, hire a firm qualified to provide the review it asks for. Put the review ahead of changes to the live workflow and give the reviewer a clear question to answer. Advice also makes sense when the money for a build has yet to be approved. A written recommendation can give management a basis for budgeting or dropping the idea.

Give an agency a spec you can test

Suppose the distributor already has a standard order spreadsheet and wants a tool that puts its rows into a draft. The file format, customer lookup and error messages are settled. The desk can supply representative files and judge the result. An agency can quote that job, and the owner can accept delivery against those files. Pay for a support term if the agency will be the first call when the spreadsheet changes.

Budget for the rollout and handover

If you ask forward deployed engineers to spend time on the order floor and stay through rollout, you are buying more of their time than a build-only quote covers. The cost includes time from your own people, too. Someone at the order desk has to explain exceptions and review changes. If the savings only justify a small build, keep discovery and the first pilot narrow. We write down the pilot’s quality criteria before building and track the results before moving to the next case. That gives the owner a point to stop when the case for further spending is weak.

Working alongside the desk gives the forward deployed engineers a head start on everyone else who might maintain the code. In your agreement, name the person who will take the handover. Give them time to use the instructions while the forward deployed engineers are available. Our guide to hiring a forward deployed engineer covers the hire itself. Use the AI consulting checklist to write acceptance criteria into the proposal you choose.

Sources

  1. OpenAI Deployment Company launch announcement (). An example of forward deployed engineers working inside customer organizations to build and deploy production systems.
  2. Progress Professional Services Agreement, section 1.2. An example of a contract that requires a signed request to change the agreed work.