This 90-day roadmap assumes one process owned by one team. The illustrative example follows a manufacturing quality team preparing its morning digest of production deviations from the previous shift’s notes.
A 13-week plan you can copy
| Week | What happens | Owner | Deliverable | Decision |
|---|---|---|---|---|
| 1 | Follow the digest from the shift notes to the morning quality meeting. Mark what belongs in the digest and what stays in the underlying records. | Quality manager | Project charter for one line and one digest | Keep release and investigation decisions with the quality team. |
| 2 | Inspect the notes the team may use. Check which lines can be traced to a shift and original record. Identify fields to omit from the approved export. | Records owner | Approved sample and field list | Remove notes the team lacks permission to process. |
| 3 | Time the analyst’s current preparation and reconciliation. Have the lead identify entries the morning meeting needs to see even on a busy shift. | Quality analyst | Baseline and list of entries the digest must preserve | Set the minimum time gain and limits for omissions before testing. |
| 4 | Agree which shifts the trial will cover and reserve review time. Add a method for identifying the original note behind each entry. | Quality manager | Trial plan and approval record | Approve the trial if the approved sample, limits and reviewers are in place. Otherwise move the date or close the trial. |
| 5 | Draft a digest from an approved export. Preserve the source identifier for each item and put contradictory notes into a section for analyst review. | Implementation engineer | Working draft generator in a private workspace | Keep the regular morning digest as the meeting’s reference. |
| 6 | Check cases on which shift notes report the same event twice. Confirm the analyst can trace what was grouped and find events that should stay separate. | Quality lead | Reviewed examples with grouping corrections | Agree which repeat entries can be combined. |
| 7 | Run the draft alongside the existing digest on new shifts. Record which entries needed a rewrite and how long the analyst spent checking both documents. | Quality analyst | Side-by-side record of results and staff time | Retain the cases that missed the agreed limits. |
| 8 | Correct the highest-impact failure the analyst observed. Test the revised version using notes from held-out shifts. | Implementation engineer | Results from held-out shifts with missed entries and version recorded | Leave untested note formats outside the release scope. |
| 9 | Review results from the held-out shifts against week 3’s limits. Rehearse getting a verified digest ready when a shift’s notes arrive late or the draft is unavailable. | Quality manager | Release decision with scope, coverage and conditions | Approve limited use if the results and recovery rehearsal pass. Otherwise continue the manual digest. |
| 10 | Begin analyst-reviewed use at the regular morning meeting for the selected line. Record who released each digest and which version reached the meeting. | Quality lead | First live digest and release record | Keep other production lines on their usual process. |
| 11 | Check whether the digest arrived by the meeting and whether the analyst had time to resolve disputed entries. Review the underlying notes for any omissions. | Quality analyst | First operating review with an issue log | Fix the largest source of delay or repeated corrections within the approved scope. |
| 12 | Arrange coverage while the primary analyst steps away. Have the replacement prepare one digest, find the notes behind a disputed item and record the release. | Quality lead | Coverage rehearsal and team procedures | Resolve any issue that still needs the project engineer present. |
| 13 | Review time and omissions since launch. Record unresolved items with owners and reserve time to review the live process again after the project closes. | Quality manager | Day-90 record with upkeep assignments | Set the next review date with the owner who will run it. |
Why the approvals sit in weeks 4 and 9
Week 4 is when you can see how much of the team’s time the trial will take. The records owner has seen the actual notes and the analyst knows which entries are essential to the meeting. The quality manager can ask for an approved sample and time on the analyst’s calendar before assigning the build. Use the AI readiness assessment to find anything those first rows leave unanswered.
Week 9 leaves room for the analyst to review results from the held-out shifts, whose notes the engineer kept out of development. The quality manager needs a written release scope and a named person responsible for the first morning it runs. The go-live checklist gives the team tests to schedule before that meeting. If the results run late, keep producing the existing digest. Reschedule the approval once the manager knows when the results will be ready.
Keep the two approvals as separate entries in the project document. Trial approval gives the engineer access to agreed records in a test workspace. Release approval lets the quality team use a reviewed digest at its meeting. Record the approved production line and shift coverage in the second decision so the scope is clear when another production line asks to join.
Fit the dates to the work your team sees
Fill in the table
Paste the table into a shared document and put the actual dates next to the week numbers. Above it, write the name of the workflow, the result people depend on and the person who can authorize changes. Replace each role with a name. Keep one accountable person per row even if the same person appears several times. The GAO’s AI accountability framework recommends defining who has responsibility and who has the authority to act. The week assignments here are choices for this example.
Plan around approvals and review time
Mark dates that depend on an approval outside the team. If the records owner needs to arrange a new export, put an expected delivery date and contact into week 2. Use the wait to agree which digest entries are essential and collect the manual timing the team can obtain. Move the trial approval if the approved sample is still unavailable. If you are assigning weekly work before the process itself is clear, use the implementation guide to decide which deliverable belongs first.
Set aside time for the work in each row with its owner. For week 7, arrange a review slot close enough to the shift that the analyst can ask what a shorthand note meant. If review time is only available on certain mornings, plan which shifts to cover on those mornings and leave room to inspect any cases that come in late.
Set the release scope and record the decision
Stretch the trial when you need more variation in the underlying work. A quiet stretch with routine shift notes could make the digest look ready for an unusually busy morning. Add time to cover the kind of shift where the analyst has to disentangle several reports about the same event. When the calendar is tight, reduce the release scope to the kinds of shifts and records the team has seen. Keep the approved sample before the trial and review results from the held-out shifts before the release decision.
In an illustrative week 9 decision, the digest lists a press stoppage once and links to the operator and maintenance notes from a held-out day shift. The analyst checks both notes and confirms they describe the same event. The draft meets the pretrial time and omission limits, and the team passes the recovery rehearsal. The quality manager approves the digest for day shifts on that line. Overnight shifts keep the manual digest until the team tests their note format against the same limits. If the digest starts combining separate events, the manager reopens the decision.
Use each decision cell as a record once the week ends. Keep the original condition and add the decision date and a link to the deliverable the owner reviewed. If week 8 exposes an untested note format, record which format was excluded and what sample would be enough to reconsider it. The next owner can see which note formats need a fresh review before they are added to the digest.
Schedule launch and the day-90 review
Reserve time beyond the first day of use. If the example’s morning meeting is canceled during launch week, the analyst still needs a real meeting to check whether the digest arrives in time and answers the team’s questions. Keep the operating review and coverage rehearsal on the calendar when you move the release. At day 90, write the current phase beside the date, name the owner of any unfinished deliverable and record when they will bring it back for review.